|
|
|
US Bank Building
|
|
|
|
|
Multi-Unit Apartment in Shaker Heights
|
|
|
|
Multi-Unit Apartment in Shaker Heights
|
|
|
|
Downtown Cleveland Condo Project
|
|
|
|
|
Rini Real Estate Building
|
|
|
|
Apartment Building in Little Italy
|
|
|
|
Commercial Garage/Shop in Little Italy
|
|
|
|
Old Hanna Estate in Bratenahl
|
|
|
|
Gould Electronics
|
|
|
|
|
Small Commercial Auto Repair Shop
|
|
|
|
|
Condominium in Solon
|
|
|
|
Warehouse/Office in Masillon
|
|
|
|
|
|
Infrared Taken on Underside of Warehouse Roof
|
|
|
|
Ohio Orthopedic Center of Excellence in Columbus
|
|
|
|
|
Solon Fire Station
|
|
|
|
Preparing for Infrared Roof Scan
|
|
|
|
|
EPDM Roof Scan Project in Columbus
|
|
|
|
Standing Seam metal Roof from Columbus Office Project
|
|
|
|
Rooftop Equipment, a Likely Place to Begin a Roof Survey
|
|
|
|
Thermal Anomalies Marked for Repair During Roof Survey
|
|
|
|
Area where SS Roof, EPDM, Metal Copings on Parapet Walls and EIFS may all play roll in leakage
|
|
|
|
|
Thermal Anomaly Indicates Area Where Moisture may Be Leaking at Masonry Wall. All Anomalies Are verified by Core Sampling and/or Moisture Detection
|
|
|
|
Jack Matia Honda (Elyria)
|
|
|
|
Jack Matia (Elyria)
|
|
|
|
Rooftop unit on commercial project
|
|
|
|
Ponding Water at Rooftop Unit
|
|
|
|
|
Failing Curb Under Mechanicals on Roof Were Found to be Leaking
|
|
|
|
Full Size Indy Car Inside of Commercial Project
|
|
|
|
Suspect area discovered on recent Phase I ESA
|
|
|
|
Cleanup ongoing near recent Phase I
|
|
|
|
Phase I Performed in Beachwood for Developers
|
|
|
|
|
Cleanup Underway Near Recent Phase I ESA
|
|
|
|
Spalling Masonry on Apartment Building
|
|
|
|
Terra Cotta Block Foundation Severely Damaged and Failing
|
|
|
|
Foundation Bowed From Hydrostatic Pressure. Note The Soil Stack Ready To Fail From Being Pushed By Wall.
|
|
|
|
Another View of Severely Damaged Foundation in Failure
|
|
|
|
|
Old Lead Wire Circuit Breaker
|
|
|
|
Recent Project in Pittsburgh. Interior Leakage From Masonry Veneer and Failing Roof Cover Had to be Evaluated
|
|
|
|
Stone Veneer Was Sealed to Prevent Water. In Reality It May Be Trapping Water in Wall.
|
|
|
|
Entire Section of Insulation Was Left Out by Contractor. This Led to Energy Loss and Condensation Issues.
|
|
|
|
Canned Lights Are a Major Source of Air Leakage When Not Properly Installed.
|
|
|
|
|
Phase I and ASTM 2018 PCA Recently Performed at Cleveland Area Landmark
|
|
|
|
Architectural Plaster Damaged by Roof Leak
|
|
|
|
Main HVAC Control Panel. Building Had 7 Rooftop Split Systems for Heating/Cooling Building
|
|
|
|
No Exhaust is Leaving This Stack!!
|
|
|
|
This BUR is Well Beyond Replacement Time. The Roof Was Leaking.
|
|
|
|
|
Water Problems on This Commercial Roof Were Found To Be Related to Thermal Bridging, Building Pressure and Inadequate Ventilation
|
|
|
|
Outdoor Air Intake Located Adjacent to Parking Lot and Trash Receptors. In Addition, Note Heat Pump. OAI Pulling Warm Air In From Heat Pump.
|
|
|
|
Large Return in Hall Was Found to be Depressurizing Building and Pulling Contaminants Toward Office Area.
|
|
|
|
Warped Hardiplank siding resulting from poor installation
|
|
|
|
Hardiplank warping due to poor installation
|
|
|
|
|
Building paper falling from Hardiplank siding. This indicates a poor installation.
|
|
|
|
Discount Drug Mart
|
|
|
|
Flexcore concrete deck on commercial project.
|
|
|
|
Single ply EPDM roof membrane. This building roof lacked walkways, which could result in membrane damage.
|
|
|
|
Rooftop refrigeration unit.
|
|
|
|
|
Poor Hardiplank installation. This application was not primed or painted and joint application was poor.
|
|
|
|
Infrared Thermography used on CMHA project working with Siemens Building Technologies, Inc.
|
|
|
|
Infrared on Siemens Bldg. Tech. project
|
|
|
|
Disconnected ductwork on CMHA project for Siemens Bldg. Technologies
|
|
|
|
Tube heater in commercial warehouse
|
|
|
|
|
Insulation, building envelope testing & diagnostics in commercial office building
|
|
|
|
Air handler located in drop ceiling. System was de-pressurizing ceiling add to energy costs.
|
|
|
|
Large warehouse in which performance testing was used to evaluate enrgy losses.
|
|
|
|
Damaged parapet discovered on roof of industrial client
|
|
|
|
Brick and timber construction from the turn of the century is showing some signs of age
|
|
|
|
|
Corrosion has taken its toll on this exhaust system
|
|
|
|
Damaged wood deck in old brick and timber construction in Cleveland
|
|
|
|
|
|
|
|