recent projects completed by C.L.I.

C.L.I. has successfully completed projects in all areas of Ohio for commercial clients


Commissioning
Systems
Indoor Air Quality
Inspections
Energy
Expert Services
Builders
Projects
Equipment
Products
Publications
R & D
Contact Us
Resume'
Training

 

 

Below are images from some of our recent projects in Cleveland, Massillon and Columbus. Projects included infrared thermography roof scans, property condition assessments and phase I environmental site surveys. 

We Carry E & O and Professional Liability Insurance for All Projects, Commercial and Residential

US Bank Building

Multi-Unit Apartment in Shaker Heights

Multi-Unit Apartment in Shaker Heights

Downtown Cleveland Condo Project

Rini Real Estate Building

Apartment Building in Little Italy

Commercial Garage/Shop in Little Italy

Old Hanna Estate in Bratenahl

Gould Electronics

Small Commercial Auto Repair Shop

Condominium in Solon

Warehouse/Office in Masillon

Infrared Taken on Underside of Warehouse Roof

Ohio Orthopedic Center of Excellence in Columbus

Solon Fire Station

Preparing for Infrared Roof Scan

EPDM Roof Scan Project in Columbus

Standing Seam metal Roof from Columbus Office Project

Rooftop Equipment, a Likely Place to Begin a Roof Survey

Thermal Anomalies Marked for Repair During Roof Survey

Area where SS Roof, EPDM, Metal Copings on Parapet Walls and EIFS may all play roll in leakage

Thermal Anomaly Indicates Area Where Moisture may Be Leaking at Masonry Wall. All Anomalies Are verified by Core Sampling and/or Moisture Detection

Jack Matia Honda (Elyria)

Jack Matia (Elyria)

Rooftop unit on commercial project

Ponding Water at Rooftop Unit

Failing Curb Under Mechanicals on Roof Were Found to be Leaking

Full Size Indy Car Inside of Commercial Project

Suspect area discovered on recent Phase I ESA

Cleanup ongoing near recent Phase I

Phase I Performed in Beachwood for Developers

Cleanup Underway Near Recent Phase I ESA

Spalling Masonry on Apartment Building

Terra Cotta Block Foundation Severely Damaged and Failing

Foundation Bowed From Hydrostatic Pressure. Note The Soil Stack Ready To Fail From Being Pushed By Wall.

Another View of Severely Damaged Foundation in Failure

Old Lead Wire Circuit Breaker

Recent Project in Pittsburgh. Interior Leakage From Masonry Veneer and Failing Roof Cover Had to be Evaluated

Stone Veneer Was Sealed to Prevent Water. In Reality It May Be Trapping Water in Wall.

Entire Section of Insulation Was Left Out by Contractor. This Led to Energy Loss and Condensation Issues.

Canned Lights Are a Major Source of Air Leakage When Not Properly Installed.

Phase I and ASTM 2018 PCA Recently Performed at Cleveland Area Landmark

Architectural Plaster Damaged by Roof Leak

Main HVAC Control Panel. Building Had 7 Rooftop Split Systems for Heating/Cooling Building

No Exhaust is Leaving This Stack!!

This BUR is Well Beyond Replacement Time. The Roof Was Leaking.

Water Problems on This Commercial Roof Were Found To Be Related to Thermal Bridging, Building Pressure and Inadequate Ventilation

Outdoor Air Intake Located Adjacent to Parking Lot and Trash Receptors. In Addition, Note Heat Pump. OAI Pulling Warm Air In From Heat Pump.

Large Return in Hall Was Found to be Depressurizing Building and Pulling Contaminants Toward Office Area.

Warped Hardiplank siding resulting from poor installation

Hardiplank warping due to poor installation

Building paper falling from Hardiplank siding. This indicates a poor installation.

Discount Drug Mart

Flexcore concrete deck on commercial project.

Single ply EPDM roof membrane. This building roof lacked walkways, which could result in membrane damage.

Rooftop refrigeration unit.

Poor Hardiplank installation. This application was not primed or painted and joint application was poor.

Infrared Thermography used on CMHA project working with Siemens Building Technologies, Inc.

Infrared on Siemens Bldg. Tech. project

Disconnected ductwork on CMHA project for Siemens Bldg. Technologies

Tube heater in commercial warehouse

Insulation, building envelope testing & diagnostics in commercial office building

Air handler located in drop ceiling. System was de-pressurizing ceiling add to energy costs.

Large warehouse in which performance testing was used to evaluate enrgy losses.

Damaged parapet discovered on roof of industrial client

Brick and timber construction from the turn of the century is showing some signs of age

Corrosion has taken its toll on this exhaust system

Damaged wood deck in old brick and timber construction in Cleveland

 

 